MDT announces a one-piece accessory bridge for selected chassis
MDT is expanding its accessory range with a long mounting bridge for selected chassis. The NV Bridge was introduced on 16 September 2026 and, according to the announcement, has been available since 15 September.

MDT is expanding its accessory range with a long mounting bridge for selected chassis. The NV Bridge was introduced on 16 September 2026 and, according to the announcement, has been available since 15 September.
The bridge is approximately 330 mm long and provides additional mounting space above the forend. MDT lists selected versions of the ACC Elite, ACC Premier Gen 2 and LSS Gen 3 Competition as compatible platforms. The exact chassis version remains important when choosing it.
The rail has an inclination of 20 MOA / approximately 5.82 MRAD. The bridge is made from 6061-T6 aluminium; MDT specifies hard anodising with a Cerakote coating.
